CODE |
DESCRIPTION |
S |
SOIL – inspect soil conditions, formwork, and reinforcing steel prior to pouring footings. |
REB |
FOUNDATION REBAR PLACEMENT – inspection of required foundation reinforcing prior to pouring concrete. |
OLS |
ONTARIO LAND SURVEYOR CERTIFICATE - certificate of lot grading and location of building on site to be submitted prior to foundation system inspection being requested. |
FS |
FOUNDATION SYSTEMS – inspect weeping tile, crushed stone and all required damp proofing prior to backfill. |
SS |
SITE SERVICES - |
BSBT |
BUILDING SEWER BALL TEST – test conducted by plumbing contractor to verify proper grade of main sanitary drain from interior building drain cleanout to property line cleanout. |
DWVB |
BUILDING DRAINS – BELOW GROUND – verify all size, type and location of drainage and venting pipes, as well as a water or air pressure test to be conducted by plumbing contractor. |
IBS |
INSULATION BELOW SLAB – verify type and R value of below slab insulation prior to pouring slab. |
SLAB |
CONCRETE SLAB REINFORCING - inspection of required slab reinforcing prior to pouring concrete. |
FM1 |
FRAMING – PART 9 – inspect all framing materials prior to insulating or covering. |
FM2 |
FRAMING – OTHER THAN PART 9 - inspect all framing materials prior to insulating or covering. |
FSC |
FIRE SEPERATIONS AND CLOSURES – inspect fire rated components and assemblies. |
FP |
FIRE PLACE / WOOD STOVE – verify proper clearance to combustibles is provided. |
CH |
CHIMNEY – verify size, type and location; also verify clearance to combustibles. |
HVA1 |
HVAC ROUGH-IN – PART 9 – inspect all supply, return and exhaust air ducts prior to covering. |
HVA2 |
HVAC ROUGH-IN – OTHER THAN PART 9 - inspect all supply, return and exhaust air ducts prior to covering. |
DWVA |
DRAINING AND VENTING ABOVE GROUND – verify all size, type and location of drainage and venting pipes, as well as a water or air pressure test to be conducted by plumbing contractor. |
AGTI |
ABOVE GROUND TIE-INS – verify all size, type and location of drainage and venting pipes – ensure properly tied in to existing. |
IB |
INSULATION BASEMENT – verify proper R value and vapour barrier installed and sealed prior to covering. |
IFF |
INSULATION FRAMED FLOOR – verify proper R value and vapour barrier installed and sealed prior to covering. |
IW |
INSULATION WALLS – verify proper R value and vapour barrier installed and sealed prior to covering. |
ICC |
INSULATION CATHEDRAL CEILING – verify proper R value and vapour barrier installed and sealed prior to covering. |
IRC |
INSULATION ROOF AND CEILING – verify proper R value and vapour barrier installed and sealed prior to covering. |
DT |
DYE TEST – owner/contractor to arrange test with the City of North Bay Public Works Department prior to occupancy of the building. |
WDS |
WATER DISTRIBUTION SYSTEM – verify proper installation of hot & cold water. |
FSM |
FIRE SERVICE MAIN - |
FPS |
FIRE PROTECTION SYSTEMS – verify fire alarm and/or fire suppression systems. |
FAR |
FIRE ACCESS ROUTES –verify proper size and location of access for firefighting. |
PSCS |
POOL/SPA CIRC AND RECIRCULATION SYSTEM – |
ARC |
ARCHITECTURAL FINAL LETTER - final letter of acceptance from Architect. |
ELEC |
ELECTRICAL FINAL LETTER - final letter of acceptance from Electrical Engineer. |
FPL |
FIRE PROTECTION FINAL LETTER - final letter of acceptance from Fire Protecting Systems Engineer. |
GEO |
GEOTECHNICAL FINAL LETTER - final letter of acceptance from Geotechnical Engineer. |
MECH |
MECHANICAL FINAL LETTER - final letter of acceptance from Mechanical Engineer. |
SFL |
SEPTIC SYSTEM FINAL LETTER - final inspection certificate from the NBMCA. |
STR |
STRUCTURAL FINAL LETTER - final letter of acceptance from Structural Engineer. |
SPEC |
SPECIAL – site/project specific inspection not otherwise listed. |
SPCA |
SITE PLAN CONTROL AGREEMENT – owner to arrange with City of North Bay Planning Department prior to Notice of Completion. |
OPC |
OCCUPANCY PRIOR TO COMPLETION – owner wishes to occupy building prior to construction being completed. A $109 re-inspection fee must be paid prior to occupancy certificate being issued |
NOC |
COMPLETION OF BUILDING – construction is complete; formal Notice of Completion certificate is issued only if there are no outstanding inspections or fees. |
AP – INSPECTION APPROVED AE – MISSED INSPECTION DA – INSPECTION DISAPPROVED PA – INSPECTION PARTIALLY APPROVED; RE-INSPECTION MAY BE REQUIRED